Power for a first outpost: fission against solar through a dust storm
Study 002 · Study · Concept study, not a built system.
Study 002 · Study · First published 2026-10-13 · Revised 2026-10-13
Corrected 2026-10-14: the load was 40 kWe and fission was 4 × 10 kWe at about 7 t against 9.8 t of solar; it is now a 78.8 kW load, 10 + 1 units at Modeled 16.5–19.8 t, and Rucker’s full-power storm case of 17.8 t solar against 9.15 t fission. See corrections.
Question
What keeps a four-person outpost powered through a global dust storm?
Assumptions
- Total load78.8 kW: crew 31.1 kW (Rucker 2016), O₂ plant 34 kW (Kleinhenz & Paz 2017), propellant cooling 6.7 kW, breathing O₂ up to 7 kW (Study 001)
- Sol24.66 hours
- Fission unitKilopower-class, 10 kWe nameplate, about 8.75 kWe delivered; 1,500 kg complete (2017 overview) to 1,800 kg (2016 overview)
- NASA reference loads92 kWe is NASA’s figure for the solar option; the nuclear option is about 30 kWe (Cataldo 2009, DRA 5.0)
- Solar point designNASA study at Jezero (18° N): 120-day storm at average optical depth 5 (Rucker 2016)
- Worst case onlyOpportunity, June 2018: array output 645 → 22 Wh per sol at optical depth 10.8; batteries 200 Wh/kg pack-level (our assumption)
The numbers
Load: 31.1 crew + 34 O₂ plant + 6.7 propellant cooling + 7 breathing O₂ ≈ 78.8 kW
Energy per sol: 78.8 kW × 24.66 h ≈ 1,943 kWh
Fission: 10 running units × 8.75 kWe ≈ 87.5 kWe delivered (≥ 78.8 kW)
+ 1 spare = 11 units × 1,500–1,800 kg ≈ 16.5–19.8 t
first expedition, O₂ plant running before crew lands: 5 + 1 units
NASA’s own trade (Rucker 2016), 120-day dust storm at full power:
solar ≈ 17.8 t fission ≈ 9.15 t
Worst case, labelled (one aged, dusty rover; not a design):
storm / normal output 22 / 645 ≈ 3.4 % → array ≈ 29 × clear-sky size
60 sols on batteries: 1,943 kWh × 60 / 0.2 kWh/kg ≈ 583 tResult
Modeled: 16.5–19.8 t of fission (10 running 10 kWe units plus 1 spare, about 87.5 kWe delivered) carries the full 78.8 kW load, including the 34 kW oxygen plant, through a dust storm. The first expedition needs 5 + 1 units if the O₂ plant runs before the crew lands. For a 120-day dust storm at full power, Rucker 2016 puts solar at about 17.8 t against about 9.15 t for fission. The battery figure is a labelled worst case, not a design.
Trade-offs
| Fission (10 + 1 × 10 kWe) | Solar | |
|---|---|---|
| Mass | Modeled: 16.5–19.8 t; 9.15 t in Rucker 2016 (120-day storm, full power) | about 17.8 t in Rucker 2016 (120-day storm, full power) |
| Storm power | about 87.5 kWe delivered | depends on array oversize and storage |
| NASA DRA 5.0 load (Cataldo 2009) | about 30 kWe | 92 kWe |
| Latitude sensitivity | none | grows away from the equator |
| Built hardware | KRUSTY, a 1 kWe-class test (2017–2018); no 10 kWe unit built | flight-proven arrays; storm behaviour at scale unknown |
| Operations | keep-out distance or berm, cable runs, launch approval | dust cleaning, large deployed area |
Open problems
- No 10 kWe Kilopower unit has been built.
- The Rucker 2016 numbers come from a single site and a single storm case.
- Storm attenuation for a large, cleaned array is uncertain. Battery life in Martian cold over years is not established at this scale.
What would change the answer
- Put life support and thermal control on fission; run oxygen production and excavation on daytime solar and pause them in storms.
Sources
- NASA, Kilopower Overview (IAC 2017, NTRS 20180000691)
- NASA, Nuclear Systems Kilopower Overview (2016), NTRS 20160012354
- Rucker et al., “Solar Versus Fission Surface Power for Mars,” AIAA SPACE 2016, NTRS 20160010550
- Kleinhenz & Paz, “An ISRU Propellant Production System to Fully Fuel a Mars Ascent Vehicle,” AIAA 2017-0423 (2017)
- NASA, “NASA Announces Artemis Concept Awards for Nuclear Power on Moon” (2022): 40 kW, under 6 t
- NASA NSSDC, Mars Fact Sheet (solar irradiance 586.2 W/m²)
- SpaceNews, “Mars rover Opportunity weathering major dust storm” (2018): tau 10.8, 22 Wh
- “Power Requirements for the NASA Mars Design Reference Architecture (DRA) 5.0,” NTRS 20120012929
Status: Sketch is first-order arithmetic that may move by ±50%; Draft has full structure but uses an approximation we name; Study has every input sourced. Figures are rounded. Where a value is our assumption, the table says so. Errors are logged on Corrections; report one on Discord.